Installation of automated production line

MACHINE INSTALLATION & COMMISSIONING

From PO to First Part.
Installed & Validated.

Turnkey installation and commissioning — from site survey through first-part sign-off — delivered on time, on spec, and with full documentation.

On-Time Delivery
Fixed-week schedules with daily progress reporting
Trained Crew
Certified installers, electricians, and PLC engineers
First-Part Sign-Off
Validated handover with full documentation

PROJECT TIMELINE

From delivery to production in 4–8 weeks

A clear, predictable schedule — with daily status reports and a project manager you can call at any time.

W1 – W2

Site Preparation

Floor survey, utility connections, foundation, safety perimeter.

W3 – W4

Mechanical Install

Position, level, anchor, mechanical assembly and alignment.

W5 – W6

Electrical & Wiring

Cabinet placement, cable routing, terminations, loop checks.

W7

Programming & Testing

PLC load, HMI setup, dry-run testing, parameter tuning.

W8

Commissioning & Handover

Run-off, sign-off, operator training, documentation hand-back.

Engineer commissioning industrial equipment
TURNKEY DELIVERABLE
One contract, one project manager, one signed FAT.

WHAT'S INCLUDED

Complete turnkey delivery

PRE-DELIVERYSurvey & planning
  • Site survey & utility checklist
  • Foundation & layout drawings
  • Logistics planning & permits
  • Risk assessment & method statement
ON-SITEInstall & wire
  • Mechanical positioning & alignment
  • Electrical wiring & terminations
  • Pneumatic / hydraulic hook-up
  • PLC & HMI commissioning
HANDOVERValidate & document
  • Functional acceptance testing (FAT/SAT)
  • Operator & maintenance training
  • As-built drawings & O&M manuals
  • Spare parts list & warranty package

PROJECT SCOPES

Built for any kind of project

Greenfield Installation

Brand new lines on prepared sites. We coordinate everything from foundation to first part — no existing constraints.

Typical: 6 – 12 weeks
Most common for plant expansion

Brownfield Retrofit

New equipment integrated into an existing line. We minimize downtime with phased install during planned shutdowns.

Typical: 4 – 8 weeks
Designed around your downtime window

Line Relocation

Move and re-commission existing machinery — between buildings, between plants, or across borders. Full responsibility.

Typical: 3 – 6 weeks
Including dismantle & transport

STANDARDS & COMPLIANCE

Certified to international standards

Every installation is documented, tested, and signed off against the standards your quality team — and your insurer — expects.

ISO 9001:2015
CE Marked
UL Listed
RoHS Compliant
IEC 61131-3
ATEX Zone 1/21
Got a New Line to Install?
Send us your scope — we'll respond with a timeline within one business day.